FAQ

Straight answers.

The questions production directors, welding engineers and class-compliance leads ask in the first meeting, answered as plainly as we can, including where the answer is planned rather than done.

12 questionsPre-launch answersUpdated 2026-10-09

run_4b7e19 · agent graph · block B-214 · scenario 10 nodes · 1 approval gate
01 · orchestrator ingest.package ✓ SUCCEEDED 02 · aligna twin.simulate ✓ SUCCEEDED 03 · cut_profile cut.nest ✓ SUCCEEDED 04 · panel_weld weld.sequence ✓ SUCCEEDED 05 · orchestrator approve.human ◆ APPROVAL 06 · quality_anomaly inspect.fuse ✓ SUCCEEDED 07 · fair_form fair.lineheat ✓ SUCCEEDED 08 · blast_coat coat.window ✓ SUCCEEDED 09 · schedule_yard dock.reoptimise ✓ SUCCEEDED 10 · erect_align erect.align ✓ SUCCEEDED

Illustrative scenario: Block B-214 · double-bottom block · panel line PL-2 · dock D1, one block, one approval gate

FAQ

Everything we get asked

Twelve questions. If yours is not here, ask it.

Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified WPS, coating, dimensional and schedule constraints, and only at the autonomy level your yard has set. Design partners start in shadow mode, where Hullira writes nothing. Class-critical seam changes, lift plans and block release stay with named people.

Run timeline · scenario

One scenario run, step by step

Every Hullira run is an ordered, inspectable sequence. This is run_4b7e19 on Block B-214 · double-bottom block · panel line PL-2 · dock D1. Scenario completes in 10 steps with one approval gate. Predicted distortion at the erection joint fell from 4.2 mm to 1.8 mm after a back-step sequence, one porosity precursor on seam S-31 was cleared inside the WPS envelope, the ballast-tank coat ran inside a 3.4 °C dew-point margin, and the block landed at 1.6 mm with its conformance record written.

run_4b7e19 Block B-214 · double-bottom block · panel line PL-2 · dock D1 illustrative scenario SUCCEEDED
  1. 01 ingest.package SUCCEEDED 0.8 s

    Yard Orchestrator · Pulled the work package for B-214 from the yard MES: 46 plates, 212 seams under WPS-117, erection tolerance 2 mm at the D1 joint, PSPC-grade ballast-tank coating, erection slot on D1 in the dock plan. Locked the qualified WPS envelope and the class scope.

  2. 02 twin.simulate SUCCEEDED 1 m 12 s

    Ship Twin · Simulated 18 candidate weld sequences on the as-built twin with the weld-thermal surrogate, ranked on predicted distortion at the erection joint, crane reach on D1 and shift takt. Standing sequence predicts 4.2 mm; candidate #6 predicts 1.8 mm.

  3. 03 cut.nest SUCCEEDED 3 m 40 s

    Cut-and-Profile · Released the nest for 46 plates on CL-1 with the fit-up gaps candidate #6 assumes. As-cut geometry logged per plate and handed to the panel line; material yield 91.4% against the nest plan.

  4. 04 weld.sequence SUCCEEDED 2 m 05 s

    Panel-and-Weld · Loaded the back-step sequence for the non-critical seams on PL-2 and set heat input and travel speed inside WPS-117. Weld-pool and seam cameras streaming on 12 channels.

  5. 05 approve.human APPROVAL 58 s

    Yard Orchestrator · Candidate #6 also re-orders two class-critical butt seams, S-31 and S-32. Sequence changes on class-critical seams stay with a human, so the step was held for the shift welding engineer and approved at 06:12:44.

  6. 06 inspect.fuse SUCCEEDED continuous

    Quality-and-Anomaly · Twelve weld cameras and the UT station fused at the yard edge. One porosity precursor on S-31 at 06:41 flagged and cleared by a 4% wire-feed trim inside the WPS-117 envelope; the joint was routed to UT and passed.

  7. 07 fair.lineheat SUCCEEDED 4 m 30 s

    Fair-and-Form · Post-weld scan registered against the twin: 2.1 mm at the erection joint. Two line-heating passes planned on the inner bottom and executed by the fairing crew; re-scan read 1.8 mm, inside the 2 mm tolerance.

  8. 08 coat.window SUCCEEDED continuous

    Blast-and-Coat · Ballast-tank blast and first coat scheduled to a window with steel temperature 3.4 °C above dew point. Dry-film thickness read 312 µm against a 280 µm minimum on the stripe coats; PSPC evidence assembled per area.

  9. 09 dock.reoptimise SUCCEEDED 41 s

    Schedule-and-Yard · Re-solved the D1 dock and crane plan with B-214 ready 6 hours early and a neighbouring block late: erection slot pulled forward one shift, crane G2 reassigned, no berth conflict. Planner approved the revised plan.

  10. 10 erect.align SUCCEEDED 1 h 48 m

    Erect-and-Align · Both blocks scanned on D1 and registered against the twin; fit predicted at 1.6 mm. Shimming guidance issued to the erection crew, block landed and welded out, final scan 1.6 mm. Conformance record written: welds, scans, coating readings, approvals and class evidence for B-214.

Autonomy

Four levels, set per agent and per tag

A yard does not go from paper travelers to unattended welding in one step. Hullira makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then supervised control on low-risk actions. Class-critical seam changes, lift plans and block release stay with named people.

Autonomy levels and the human role at each
LevelWhat the agent doesWhat the human doesWhere it sits in a pilot
L1 · ShadowReads weld, scan, NDT, coating, robot, crane and MES signals; predicts and recommends; writes nothingRuns the process as today; compares predictions to NDT and surveyor outcomesShadow mode; the baseline is measured from the yard's own records
L2 · AssistProposes weld, fairing, coating, routing and schedule moves with evidence, confidence, envelope and rollback pathApproves each action in the review consoleAssist mode, the remainder of the pilot
L3 · Supervised controlExecutes pre-approved low-risk actions: inspection routing, coating pauses when a window drifts, weld parameters inside the WPS envelope, robot path variants tested in simulationApproves class-critical seam changes, lift plans and block releaseGraduated autonomy, after audited accuracy and ROI
L4 · BoundedSupervised work sequencing and weld adaptation for qualified block types, across processes and yardsSets the envelope; reviews the shift record and the evaluation resultsPlanned; after class, yard and insurer acceptance is earned
Guardrails

An agent that can move a weld parameter needs a leash

Hullira writes to production equipment. Every capability is scoped, every write is policy-checked against the qualified WPS, class and PSPC constraints, and every action is written to an append-only audit log the yard owns.

  • Bounded action space. Each agent writes only to an explicit tag allow-list, inside per-tag rate and magnitude limits and the qualified WPS, coating, dimensional and schedule constraints for the block.
  • Policy engine before every write. WPS and PQR, class rules, PSPC, safety limits, role permissions, autonomy level and human-approval requirements are evaluated before a parameter moves. NeMo Guardrails is the design for this layer.
  • Human-in-the-loop gates. Class-critical seam changes, lift plans, block release and class evidence wait for a named approver. Robots adapt only inside pre-approved WPS envelopes until class, yard and insurer acceptance supports more.
  • Immutable audit log. Append-only, assurance-grade and exportable. Every action records source evidence, the WPS, class or PSPC citation applied, confidence, estimated rework, dock-time and schedule impact, rollback path, approver and block scope.
  • Hard fallback. Loss of the edge node, the network or a model returns control to the robot controller, PLC or planner's last known-good state. Interlocks are never in Hullira's path.
  • Tenant and defense-aware isolation. Drawings, WPS, naval data, models and memory never cross a customer boundary. Security is defense and ITAR-aware, and on-prem or yard-edge deployment is available for naval and regulated yards.

Compliance posture

Compliance and certification status
ItemScopeStatus
SOC 2 Type ICloud control plane QUEUED Planned, first 6 months, with a defense and ITAR-aware review
SOC 2 Type IICloud control plane QUEUED Planned, 6 to 12 months
SSO and RBACConsole and approvals QUEUED Planned, 6 to 12 months
Class-society and defense assurance packagesDisposition and genealogy evidence QUEUED Planned, 6 to 12 months; not a class approval or certification claim
Cited reasoningWPS and PQR, ABS, DNV, LR, ClassNK, IMO PSPC, naval specs RUNNING In the design, every answer cites its source
Per-tenant and IP isolationDrawings, WPS, naval data, models, memory RUNNING In the design from day one
On-prem and yard-edge deploymentNaval and regulated yards RUNNING Design option

Read the security overview

Pricing

Priced per process, per yard, per group

Land on one workflow with a measured baseline. Expand by process, yard, group site and autonomy level. Outcome components are available on rework, dock time and schedule value. Annual prepay carries a 15 to 20% discount.

Billing period
Process $12,000 per production process or area / month · billed monthly

Weld, fairing or coating control, or weld-inspection AI, for one process. For yards validating ROI on the wedge.

  • One process or area, one agent module
  • Yard-edge inference node included
  • Robot, instrument and MES reads, guarded writes
  • Run log, audit trail, block genealogy
  • Business-hours support
Start a pilot
Enterprise Custom land $700k to $10M ACV

Multi-yard groups and naval programs standardising on Hullira, with custom weld, distortion and schedule models.

  • Multi-yard and program fleet management
  • Custom weld, distortion and schedule models
  • Yard-edge fleet with on-prem option
  • Group autonomy policy and approval chains
  • SLAs, SSO and RBAC, dedicated engineer
Contact us
Get started

Ask the question we missed

Start with one welding, fairing, coating or erection process and one measurable baseline. A paid pilot on weld inspection, distortion control or coating assurance shows the number before you commit further.