Customers

Who we build for, and who we are looking for first.

Hullira is pre-launch. We have no customers to name and will not borrow logos. This page says who the product is for, what a design partner commits to, and who we deliberately do not target.

Pre-launch2 to 4 design partnersPaid pilot on one process

Ideal customer

Shipbuilders and ship repairers, $50M to $10B+ operating scope

Commercial newbuild yards building tankers, bulkers, containerships, gas carriers, ferries and offshore vessels, naval and defense shipbuilders, and repair, conversion and drydocking yards running cutting, panel and block welding, fairing, blasting and coating, outfitting and erection.

weldingfairingcoatingerectiondock
Qualification

What makes a good first yard

The criteria we check, in order.

We look for

  • Enough block throughput and dock spend to drive a clear ROI; rework, dock days and schedule penalties are major costs and class risk is high
  • Existing welding robots or CAD/CAM, laser-scan or accuracy-control, NDT and coating systems with API or OT access for integration
  • An executive mandate to raise first-time quality and schedule reliability or cut rework and dock time across a group
  • Willingness to run a paid pilot with a defined rework, dock-time or class-approval success metric

We do not target

  • Small boatbuilders and workboat shops with no robotic or instrumented production scope
  • Yards unwilling to integrate CAD/CAM, robot, scan and NDT systems under IP, security and defense controls
  • Buyers looking for a horizontal dashboard rather than a system that acts
Design partner programme

What the first cohort gets and gives

Two to four yards with one high-rework process each, that agree to baseline rework, fairing hours, coating non-conformance, dock days or schedule slips from their own records before anything is written.

  1. Shadow mode. We connect read-only to the wedge workflow, observe and measure the baseline from your own NDT, scan, coating and schedule records. Nothing is written.
  2. Assist mode, the rest of the pilot. The agent recommends weld, fairing, coating or schedule moves and predicts defects and distortion. Your engineer approves each one. Accuracy and ROI are measured against the signed baseline.
  3. Graduated autonomy. Pre-approved low-risk actions run inside limits with exceptions escalated, if the yard is satisfied with the recommendations. Class-critical seams, lifts and block release stay with people.
  4. Conversion. The pilot converts to the Process tier and expands process by process. Design partners get written access terms for telemetry and quality outcomes, and a say in the roadmap.
Who it is for

Built for the people who run the yard

We have no customer quotes to show yet and will not invent any. These are the three roles in a yard we build for, and the problems they bring to the first meeting.

Yard or Production Director

Owns launch dates, the dock schedule, labour, rework and cost.

What this person is dealing with today

  • Paper travelers, manual measurement and periodic inspection that let weld quality, distortion and schedule drift
  • Dock, crane and berth slips cascading across the order book
  • A severe, retiring welder and fitter shortage against order books stretching past 2030

Welding or Accuracy-Control Engineer

Owns weld procedures, distortion and fairing strategy, dimensional accuracy and class approval.

What this person is dealing with today

  • Weld-parameter and sequence drift driving class-rejected welds, distortion and rework
  • Hull-fairing and erection dimensional error costing days of dock time per block
  • Cutting, welding, fairing, coating and erection siloed and reactive across the yard

Quality, HSE and Class-Compliance Lead

Owns weld, coating and dimensional quality, non-conformance, PSPC and classification-society and naval-program traceability.

What this person is dealing with today

  • Coating and surface-prep faults driving premature failure and warranty claims
  • Patchy traceability for class and PSPC audits
  • Outfitting clashes discovered after steel is closed, forcing cut-and-reweld rework
Segments

Where yards start

Commercial newbuild, naval and defense, repair and conversion, multi-yard groups and the OEMs that ship into the yard. Most yards pick one process and one wedge, prove the number, then expand.

Commercial newbuildTankers, bulkers, containerships, gas carriers, ferries, offshore

Commercial newbuild

Series vessels with repeat block geometries, where weld rework and fairing hours are already counted. Weldra on the panel line or Fairix on the block type that distorts most.

Naval and defenseProgram schedules, class and naval specs

Naval and defense

Naval shipbuilders under classification-society and naval quality specs with program-office and cyber approvers. Weldra inspection and the Aligna twin, deployed on-prem, with the conformance record from day one.

Repair, conversion and drydockingDock days are the cost

Repair, conversion and drydocking

Yards where the dock is the business and a coating or alignment fault is measured in dock days. Coatiq in the ballast tanks and Dockos on the dock plan.

Multi-yard groups and naval programsOne policy, many yards

Multi-yard groups and naval programs

Groups standardising weld, distortion and schedule models across sites, with the Enterprise tier, fleet-managed yard edge and per-yard private models.

OEMs that ship into the yardWelding robots, coating equipment, scanning, NDT

OEMs that ship into the yard

Welding-robot, CAD/CAM, laser-scan, NDT and coating OEMs embedding Hullira-ready autonomy in what they already sell.

Run timeline · scenario

One scenario run, step by step

Every Hullira run is an ordered, inspectable sequence. This is run_4b7e19 on Block B-214 · double-bottom block · panel line PL-2 · dock D1. Scenario completes in 10 steps with one approval gate. Predicted distortion at the erection joint fell from 4.2 mm to 1.8 mm after a back-step sequence, one porosity precursor on seam S-31 was cleared inside the WPS envelope, the ballast-tank coat ran inside a 3.4 °C dew-point margin, and the block landed at 1.6 mm with its conformance record written.

run_4b7e19 Block B-214 · double-bottom block · panel line PL-2 · dock D1 illustrative scenario SUCCEEDED
  1. 01 ingest.package SUCCEEDED 0.8 s

    Yard Orchestrator · Pulled the work package for B-214 from the yard MES: 46 plates, 212 seams under WPS-117, erection tolerance 2 mm at the D1 joint, PSPC-grade ballast-tank coating, erection slot on D1 in the dock plan. Locked the qualified WPS envelope and the class scope.

  2. 02 twin.simulate SUCCEEDED 1 m 12 s

    Ship Twin · Simulated 18 candidate weld sequences on the as-built twin with the weld-thermal surrogate, ranked on predicted distortion at the erection joint, crane reach on D1 and shift takt. Standing sequence predicts 4.2 mm; candidate #6 predicts 1.8 mm.

  3. 03 cut.nest SUCCEEDED 3 m 40 s

    Cut-and-Profile · Released the nest for 46 plates on CL-1 with the fit-up gaps candidate #6 assumes. As-cut geometry logged per plate and handed to the panel line; material yield 91.4% against the nest plan.

  4. 04 weld.sequence SUCCEEDED 2 m 05 s

    Panel-and-Weld · Loaded the back-step sequence for the non-critical seams on PL-2 and set heat input and travel speed inside WPS-117. Weld-pool and seam cameras streaming on 12 channels.

  5. 05 approve.human APPROVAL 58 s

    Yard Orchestrator · Candidate #6 also re-orders two class-critical butt seams, S-31 and S-32. Sequence changes on class-critical seams stay with a human, so the step was held for the shift welding engineer and approved at 06:12:44.

  6. 06 inspect.fuse SUCCEEDED continuous

    Quality-and-Anomaly · Twelve weld cameras and the UT station fused at the yard edge. One porosity precursor on S-31 at 06:41 flagged and cleared by a 4% wire-feed trim inside the WPS-117 envelope; the joint was routed to UT and passed.

  7. 07 fair.lineheat SUCCEEDED 4 m 30 s

    Fair-and-Form · Post-weld scan registered against the twin: 2.1 mm at the erection joint. Two line-heating passes planned on the inner bottom and executed by the fairing crew; re-scan read 1.8 mm, inside the 2 mm tolerance.

  8. 08 coat.window SUCCEEDED continuous

    Blast-and-Coat · Ballast-tank blast and first coat scheduled to a window with steel temperature 3.4 °C above dew point. Dry-film thickness read 312 µm against a 280 µm minimum on the stripe coats; PSPC evidence assembled per area.

  9. 09 dock.reoptimise SUCCEEDED 41 s

    Schedule-and-Yard · Re-solved the D1 dock and crane plan with B-214 ready 6 hours early and a neighbouring block late: erection slot pulled forward one shift, crane G2 reassigned, no berth conflict. Planner approved the revised plan.

  10. 10 erect.align SUCCEEDED 1 h 48 m

    Erect-and-Align · Both blocks scanned on D1 and registered against the twin; fit predicted at 1.6 mm. Shimming guidance issued to the erection crew, block landed and welded out, final scan 1.6 mm. Conformance record written: welds, scans, coating readings, approvals and class evidence for B-214.

Autonomy

Four levels, set per agent and per tag

A yard does not go from paper travelers to unattended welding in one step. Hullira makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then supervised control on low-risk actions. Class-critical seam changes, lift plans and block release stay with named people.

Autonomy levels and the human role at each
LevelWhat the agent doesWhat the human doesWhere it sits in a pilot
L1 · ShadowReads weld, scan, NDT, coating, robot, crane and MES signals; predicts and recommends; writes nothingRuns the process as today; compares predictions to NDT and surveyor outcomesShadow mode; the baseline is measured from the yard's own records
L2 · AssistProposes weld, fairing, coating, routing and schedule moves with evidence, confidence, envelope and rollback pathApproves each action in the review consoleAssist mode, the remainder of the pilot
L3 · Supervised controlExecutes pre-approved low-risk actions: inspection routing, coating pauses when a window drifts, weld parameters inside the WPS envelope, robot path variants tested in simulationApproves class-critical seam changes, lift plans and block releaseGraduated autonomy, after audited accuracy and ROI
L4 · BoundedSupervised work sequencing and weld adaptation for qualified block types, across processes and yardsSets the envelope; reviews the shift record and the evaluation resultsPlanned; after class, yard and insurer acceptance is earned
FAQ

Straight answers

The questions production directors, welding engineers and class-compliance leads ask in the first meeting.

Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified WPS, coating, dimensional and schedule constraints, and only at the autonomy level your yard has set. Design partners start in shadow mode, where Hullira writes nothing. Class-critical seam changes, lift plans and block release stay with named people.

Get started

Apply as a design partner

Tell us the process, the metric and the baseline you would sign. We will tell you honestly whether the wedge fits.