Every release that can touch a welding robot, written down.

Hullira has not shipped a release yet, so this page is the build log: what is planned by phase, how a release will reach a process area, and the policy for promoting models and autonomy. When the first release ships, its notes replace the top of this page.

0 releases shipped3 planned phasesRelease policy published

Status

Pre-release

QUEUEDMVP · 0 to 6 months

The first release is connectors, the agent loop, the review console and the assurance-grade class and quality audit log, for one wedge workflow on one process.

Planned

The build log by phase

Everything here is planned. Nothing here has shipped.

0 to 6 months · planned

Phase 1

  • Onboard 2 to 4 design-partner yards on the wedge workflow
  • Ship the MVP: connectors, agent loop, review console, assurance-grade class and quality audit log
  • Prove accuracy and rework, dock-time and class ROI in shadow then assist mode
  • Security and compliance baseline: SOC 2 Type I with a defense and ITAR-aware review, IP-safe edge deployment

6 to 12 months · planned

Phase 2

  • Convert design partners to paid; early revenue
  • Graduated autonomy for low-risk weld, fairing and coating loops; the yard twin hits class quality before the shift
  • Second process within the yard; deeper integrations
  • SOC 2 Type II; SSO and RBAC; first commercial and naval deployments; class-society and defense assurance packages

1 to 3 years · planned

Phase 3

  • Own the full cutting, welding, fairing, coating, outfitting and erection loop end to end
  • Single yard to multi-yard group to national and naval program fleet
  • Welding-robot, CAD/CAM, class-society and coating-vendor channel; international expansion
  • Data-network products: weld-quality, distortion, coating and schedule benchmarks as premium tiers
Policy

How a release reaches a process area

The promotion and rollback rules.

  • Model versions are promoted by process area. A new model version reaches one process area as a canary before it reaches the yard, and falls back to the previous validated version automatically.
  • Autonomy policy is versioned like code. Tag allow-lists, limits, WPS and coating envelopes and approval chains are reviewed and recorded before a release can write to a process.
  • Every release carries its evaluation record. Golden datasets and judged evaluations gate model and prompt changes in CI before promotion.
  • Rollback conditions are declared up front. Each release names the signals that trigger a return to the previous version.
Support

Version support, when versions exist

The support policy the first releases will follow.

Version support
ComponentVersioningSupport window
Yard-edge runtimeSemantic, per nodeCurrent and previous minor
ModelsPer process area, per block typePrevious validated version kept for fallback
Autonomy policyReviewed and versioned like codeHistory retained in the audit log
SDK and CLIDesign previewBreaking changes expected before release
Run timeline · scenario

The reference scenario, per release

Each release will be checked against this scenario before it reaches a process area.

run_4b7e19 Block B-214 · double-bottom block · panel line PL-2 · dock D1 illustrative scenario SUCCEEDED
  1. 01 ingest.package SUCCEEDED 0.8 s

    Yard Orchestrator · Pulled the work package for B-214 from the yard MES: 46 plates, 212 seams under WPS-117, erection tolerance 2 mm at the D1 joint, PSPC-grade ballast-tank coating, erection slot on D1 in the dock plan. Locked the qualified WPS envelope and the class scope.

  2. 02 twin.simulate SUCCEEDED 1 m 12 s

    Ship Twin · Simulated 18 candidate weld sequences on the as-built twin with the weld-thermal surrogate, ranked on predicted distortion at the erection joint, crane reach on D1 and shift takt. Standing sequence predicts 4.2 mm; candidate #6 predicts 1.8 mm.

  3. 03 cut.nest SUCCEEDED 3 m 40 s

    Cut-and-Profile · Released the nest for 46 plates on CL-1 with the fit-up gaps candidate #6 assumes. As-cut geometry logged per plate and handed to the panel line; material yield 91.4% against the nest plan.

  4. 04 weld.sequence SUCCEEDED 2 m 05 s

    Panel-and-Weld · Loaded the back-step sequence for the non-critical seams on PL-2 and set heat input and travel speed inside WPS-117. Weld-pool and seam cameras streaming on 12 channels.

  5. 05 approve.human APPROVAL 58 s

    Yard Orchestrator · Candidate #6 also re-orders two class-critical butt seams, S-31 and S-32. Sequence changes on class-critical seams stay with a human, so the step was held for the shift welding engineer and approved at 06:12:44.

  6. 06 inspect.fuse SUCCEEDED continuous

    Quality-and-Anomaly · Twelve weld cameras and the UT station fused at the yard edge. One porosity precursor on S-31 at 06:41 flagged and cleared by a 4% wire-feed trim inside the WPS-117 envelope; the joint was routed to UT and passed.

  7. 07 fair.lineheat SUCCEEDED 4 m 30 s

    Fair-and-Form · Post-weld scan registered against the twin: 2.1 mm at the erection joint. Two line-heating passes planned on the inner bottom and executed by the fairing crew; re-scan read 1.8 mm, inside the 2 mm tolerance.

  8. 08 coat.window SUCCEEDED continuous

    Blast-and-Coat · Ballast-tank blast and first coat scheduled to a window with steel temperature 3.4 °C above dew point. Dry-film thickness read 312 µm against a 280 µm minimum on the stripe coats; PSPC evidence assembled per area.

  9. 09 dock.reoptimise SUCCEEDED 41 s

    Schedule-and-Yard · Re-solved the D1 dock and crane plan with B-214 ready 6 hours early and a neighbouring block late: erection slot pulled forward one shift, crane G2 reassigned, no berth conflict. Planner approved the revised plan.

  10. 10 erect.align SUCCEEDED 1 h 48 m

    Erect-and-Align · Both blocks scanned on D1 and registered against the twin; fit predicted at 1.6 mm. Shimming guidance issued to the erection crew, block landed and welded out, final scan 1.6 mm. Conformance record written: welds, scans, coating readings, approvals and class evidence for B-214.

Tool calls · scenario

What the tool log will show per release

Every tool invocation, argument and result is written to an append-only, human-readable log, and every reasoning step is expandable. Nothing about a run is hidden from the yard or the surveyor.

tool-call stream · run_4b7e19
  1. 06:04:10mes.read_packages({ block: "B-214", dock: "D1" })
  2. 06:04:11ok 46 plates · 212 seams · WPS-117 · 2 mm at D1 joint
  3. 06:04:12twin.simulate({ candidates: 18, objective: "distortion, reach, takt" })
  4. 06:05:24ok best #6 · joint 1.8 mm · reach ok · takt +0.4 h
  5. 06:05:25policy.evaluate({ plan: 6, autonomy: "L2+" })
  6. 06:05:25ok 8 writes permitted · class-critical seam order requires human approval
  7. 06:05:26cutter.set_program({ machine: "CL-1", nest: "B214-N3" })
  8. 06:09:06ok 46 plates cut · yield 91.4% · geometry logged
  9. 06:09:07weld.set_sequence({ line: "PL-2", plan: 6, scope: "non-critical" })
  10. 06:11:12ok back-step loaded · heat input inside WPS-117
  11. 06:11:46approval.request({ action: "seam_sequence", seams: ["S-31", "S-32"] })
  12. 06:12:44ok approved by shift welding engineer · logged
  13. 06:12:45sensors.fuse({ cams: 12, ut: true })
  14. 06:41:03precursor: porosity risk 0.57 · seam S-31 · 1.2 m from start
  15. 06:41:04robot.set_parameters({ cell: "PL-2.R3", wire_feed: "-4%", within: "WPS-117" })
  16. 06:41:19ok porosity risk 0.57 → 0.09 · S-31 routed to UT · passed
  17. 09:20:30scan.register({ block: "B-214", stage: "post-weld" })
  18. 09:21:02ok joint 2.1 mm · 2 line-heat passes planned
  19. 11:02:40ok re-scan 1.8 mm · inside 2 mm tolerance
  20. 11:02:41coat.schedule_area({ area: "BT-214", spec: "PSPC" })
  21. 11:02:42ok window open · steel 3.4 °C above dew point · DFT 312 µm
  22. 11:03:00cuopt.solve({ dock: "D1", horizon: "14d" })
  23. 11:03:41ok slot pulled forward 1 shift · crane G2 reassigned · planner approved
  24. 14:30:12align.guide({ block: "B-214", dock: "D1" })
  25. 16:18:40ok landed 1.6 mm · conformance record written · scenario complete

Reasoning trace

Plan, thought, action, observation, exactly as the orchestrator would record it.

GoalBuild and erect B-214 inside WPS-117, hold the erection joint …

Build and erect B-214 inside WPS-117, hold the erection joint within 2 mm, coat the ballast tank inside the PSPC window, and land it on D1 by the dock plan.

PlanSimulate weld sequences on the twin first. Lead with the seque…

Simulate weld sequences on the twin first. Lead with the sequence because distortion is decided at the arc, then cut to the fit-up the sequence assumes, then weld and inspect continuously. Scan after welding and fair only what the scan shows. Hold any class-critical seam change for a human.

ThoughtThe standing sequence welds the inner bottom straight through …

The standing sequence welds the inner bottom straight through and predicts 4.2 mm at the joint, which means fairing hours and a risk to the D1 slot. A back-step sequence with two class-critical seams re-ordered predicts 1.8 mm at a cost of 0.4 hours of takt.

Actiontwin.simulate(candidates=18) returns plan #6: back-step on the…

twin.simulate(candidates=18) returns plan #6: back-step on the non-critical seams, S-31 and S-32 re-ordered, heat input held inside WPS-117.

ObservationPlan #6 predicts 1.8 mm at the joint and clear crane reach on …

Plan #6 predicts 1.8 mm at the joint and clear crane reach on D1. Three candidates scored lower on distortion but moved heat input outside the WPS envelope and were discarded.

ActionExecute plan #6: eight bounded writes permitted on cutting, no…

Execute plan #6: eight bounded writes permitted on cutting, non-critical weld sequence, parameters inside WPS, coating windows and dock plan; the class-critical seam order routed to the shift welding engineer.

ObservationPorosity precursor on S-31 at 06:41:03. A 4% wire-feed trim in…

Porosity precursor on S-31 at 06:41:03. A 4% wire-feed trim inside WPS-117 cleared it in 15 s; the joint was routed to UT and passed. Post-weld scan 2.1 mm, two line-heating passes brought it to 1.8 mm.

OutcomeScenario complete. Block landed at 1.6 mm, ballast tank coated…

Scenario complete. Block landed at 1.6 mm, ballast tank coated inside the window, conformance record written for class review.

Autonomy

Four levels, set per agent and per tag

A yard does not go from paper travelers to unattended welding in one step. Hullira makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then supervised control on low-risk actions. Class-critical seam changes, lift plans and block release stay with named people.

Autonomy levels and the human role at each
LevelWhat the agent doesWhat the human doesWhere it sits in a pilot
L1 · ShadowReads weld, scan, NDT, coating, robot, crane and MES signals; predicts and recommends; writes nothingRuns the process as today; compares predictions to NDT and surveyor outcomesShadow mode; the baseline is measured from the yard's own records
L2 · AssistProposes weld, fairing, coating, routing and schedule moves with evidence, confidence, envelope and rollback pathApproves each action in the review consoleAssist mode, the remainder of the pilot
L3 · Supervised controlExecutes pre-approved low-risk actions: inspection routing, coating pauses when a window drifts, weld parameters inside the WPS envelope, robot path variants tested in simulationApproves class-critical seam changes, lift plans and block releaseGraduated autonomy, after audited accuracy and ROI
L4 · BoundedSupervised work sequencing and weld adaptation for qualified block types, across processes and yardsSets the envelope; reviews the shift record and the evaluation resultsPlanned; after class, yard and insurer acceptance is earned
Accelerated computing

Physical AI, at the arc

A weld pool is decided in milliseconds and a dock waits by the hour. Perception has to be local, deterministic and fast, so Hullira runs GPU inference at the yard edge and keeps training, simulation and optimisation in the cloud or on-prem.

Jetson Orin · DeepStream · Holoscan · TensorRT

Edge perception

6 to 24 cameras per process area plus UT, X-ray, thermal, laser-scan, photogrammetry, robot and coating-instrument streams fused at the yard edge. Sub-50 ms weld alerts and sub-150 ms coating or scan prompts are the design targets. Jetson Thor is planned for higher camera density.

Triton · NIM

Model serving

Weld-defect, distortion-risk, coating-risk, point-cloud and schedule-risk models behind one orchestrator at the yard edge, versioned with rollback, routed by latency, tenant, sensitivity and cost.

DGX or HGX · NeMo

Training

Weld-defect vision, UT and X-ray classification, NeMo class-rule reasoning and weld-thermal FEA surrogates fine-tuned per tenant: 100 to 500 GPU-hours per yard during onboarding, then monthly retraining from engineer corrections and class outcomes. Dedicated training capacity is planned.

Omniverse · OVX · Modulus

Ship and yard twin

Block erection, weld sequence, robot reach, crane paths and yard layout simulated before the shift, as-built against as-designed. GPU weld-thermal and structural FEA is the workload; physics-informed surrogates rank plans at shift cadence.

Cosmos · Omniverse Replicator

Synthetic data

Rare weld defects, coating failures, distortion modes, occluded seams and erection misalignment cases generated and validated against real NDT and scan distributions before promotion. 50k to 250k variants per vessel class is the target. Planned.

cuOpt

Optimisation

Dock, crane and berth schedules, work-package sequencing, yard logistics and erection order, re-solved as progress changes.

Isaac · Isaac ROS

Robot cells and crawlers

Robotic weld, blast, coat and inspection cells and crawler or drone hull inspection, with paths validated in simulation before they run next to a hull.

RAPIDS

GPU ETL

Telemetry ETL across weld parameters, scans, NDT results, coating readings, non-conformance and schedule history, for retraining, drift detection and rework, dock-time and schedule benchmarks.

NeMo Guardrails · Retriever

Policy and grounding

WPS and PQR, class-rule, PSPC, cyber and human-approval policies enforced before any action writes back to robots, MES, QA or work packages; retrieval with citations and tenant isolation.

FAQ

Straight answers

The questions production directors, welding engineers and class-compliance leads ask in the first meeting.

Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified WPS, coating, dimensional and schedule constraints, and only at the autonomy level your yard has set. Design partners start in shadow mode, where Hullira writes nothing. Class-critical seam changes, lift plans and block release stay with named people.

Get started

Follow the release line

Ask to be told when the first release ships.