Build the hull the drawing describes.
Hullira is the autonomous operations layer for shipbuilding and ship repair. Agents at the yard edge control cutting, welding, distortion, coating and erection, and check every block against an as-built ship twin before it reaches the dock.
Every check Hullira runs compares the steel in the yard with the lines and block drawings it was cut from. Block B-214 is the illustrative scenario followed further down this page.
- Drawing
- Lines plan, illustrative
- Scale
- Not to scale
- Status
- Pre-launch
Plate to sea trials, and where each stage leaks time
A hull is built as overlapping work: plates are cut while panels are welded, and blocks are outfitted before they are erected. Each bar is a stage of that programme. Each red mark is where yards lose time to rework today, and where a Hullira agent sits.
- Stage of work
- Where rework or waiting starts
- Programme milestone
- Bar lengths are schematic, not a yard's programme.
- 1
Steel cutting
- What drifts
- Nest yield and as-cut geometry. A fit-up gap that is wrong at the cutter gets welded wrong on the panel line.
- What Hullira does
- The cut-and-profile agent controls nesting, cutting and profiling against material and distortion budgets, and logs as-cut geometry per plate for the panel line.
- 2
Panel line
- What drifts
- Weld parameters. A class-rejected weld is found days after the block closes, then ground out and re-welded.
- What Hullira does
- Weldra fuses weld-pool and seam cameras with UT and X-ray into a defect risk per joint, trims parameters inside the qualified WPS envelope, and routes the suspect joint to inspection before the block closes.
- 3
Block assembly, blast and coat
- What drifts
- Weld-induced distortion, paid back in fairing hours, and coating applied outside its humidity and dew-point window.
- What Hullira does
- Fairix picks the weld order and back-step pattern on the twin before the arc strikes and plans line heating from the scan. Coatiq schedules blast and coat to an open window, pauses robotic cells when it drifts and assembles the PSPC evidence per area.
- 4
Erection in dock
- What drifts
- A block that will not fit at the joint, with a dock that rents for six figures a day waiting on it.
- What Hullira does
- Aligna registers both blocks' scans against the as-built twin and predicts the fit before the crane moves. Dockos re-solves the dock and crane plan when blocks run early or late.
- 5
Outfitting
- What drifts
- Pipe, cable and machinery clashes that only show up after the steel is closed.
- What Hullira does
- The outfit-and-route agent sequences block outfitting and flags pipe, cable and machinery clashes while the block is still open.
- 6
Sea trials and delivery
- What drifts
- Class approval waiting on evidence nobody wrote down at the time.
- What Hullira does
- The conformance agent has kept the record per block all along: welds, scans, coating readings and approvals, written for the surveyor. Hullira does not run the trials.
Block B-214, revised on the twin instead of in steel
A double-bottom block on panel line PL-2, bound for dock D1 with a 2 mm tolerance at the erection joint. Read it the way a drafter reads a revision table: each line is a change made before it could become rework.
| Rev | Change | At joint | By |
|---|---|---|---|
| A | Standing straight-through sequence. The twin predicts the joint misses tolerance. | 4.2 mm | Schedule-and-Yard |
| B | Back-step sequence #6, picked from 18 candidates simulated on the twin. | 1.8 mm | Fairix |
| C | Porosity precursor on seam S-31 cleared inside WPS-117 before the block closed. | n/a | Weldra |
| D | Ballast-tank coat applied inside a 3.4 °C dew-point margin. | n/a | Coatiq |
| E | Block landed at D1. Conformance record written for the surveyor. | 1.6 mm | Aligna |
- Rev A, predicted4.2 mm
- Rev B, predicted1.8 mm
- Rev E, landed1.6 mm
Scale 0 to 5 mm. Dashed yellow line: 2 mm tolerance.
The new sequence cost 0.4 hours of takt. Schedule-and-Yard wanted the straight sequence to save that time and hold the D1 slot. The orchestrator gave the seam order to Fairix: a 2 mm breach costs fairing hours and the dock slot, and 0.4 hours does not. The time came back when a neighbouring block ran late and the D1 slot moved forward.
Illustrative scenario. No customer result is claimed.
A dry dock costs six figures a day. Dockos plans it that way.
In repair, conversion and drydocking, the dock is the business, and a coating or alignment fault is counted in dock days. Most yards plan docks, cranes and berths in spreadsheets and MES dashboards that report status but do not optimise.
A block runs late
Dockos takes live progress from Weldra, Fairix, Coatiq and Aligna and re-solves the erection order and dock slots.
A coating window closes
Coatiq's windows are constraints in the plan, so the tank that cannot be coated today moves, not the crane.
A crane is double-booked
Cranes, berths and thousands of work packages are solved together on GPUs with cuOpt, and block transport is routed around clashes.
The planner signs
Dockos starts in advisory mode. Changes to erection order and slots stay under planner approval.
The first Dockos deployment is judged on dock utilisation and on-time block erection on one named dock.
Five products, one drawing set
Each product owns a stage of the build and hands its result to the next: weld data drives distortion control, a block held inside tolerance goes to erection, and every signal feeds the dock plan.
-
Weldra
Autonomous welding that hits class-grade quality without rework, with every defect seen by vision, X-ray and UT.
Acts on stage 2, panel line Read about Weldra -
Fairix
Predicts weld distortion and fairs the hull before it costs dock days.
Acts on stage 3, block assembly Read about Fairix -
Coatiq
Blasts and coats to PSPC and class spec the first time, every square metre.
Acts on stage 3, blast and coat Read about Coatiq -
Aligna
Erects and aligns mega-blocks to millimetre accuracy, simulated before the lift. Hosts the as-built ship twin.
Acts on stage 4, erection Read about Aligna -
Dockos
Optimises dock, crane and berth schedules against a hard launch date.
Acts on stages 4 to 6, the dock Read about Dockos
Steel cutting and outfitting run as the cut-and-profile and outfit-and-route agents inside the Yard tier. See every agent
Priced by the process, the yard or the group
Start on one process with a measured baseline. Expand by process, yard, group site and autonomy level.
Process
Weld, fairing or coating control, or weld-inspection AI, for one process. For yards proving the number first.
$12,000 per process or area, per month, billed monthly- One process or area, one agent module
- Yard-edge inference node included
- Robot, instrument and MES reads, guarded writes
- Run log, audit trail, block genealogy
Yard
Every stage on the chart above, plus quality, schedule, yard logistics and the twin.
$85,000 per yard, per month, billed monthly- All control agents on every process
- Fused inspection on every line
- Robotic weld, blast and inspection cells
- As-built ship twin and dock optimisation
- 24/7 support, quarterly model review
Enterprise
Multi-yard groups and naval programs standardising on Hullira.
Custom land $700k to $10M ACV- Custom weld, distortion and schedule models
- Yard-edge fleet with on-prem option
- Group autonomy policy and approval chains
- SLAs, SSO and RBAC, dedicated engineer
Outcome components are available on rework, dock time and schedule value. Annual prepay carries a 15 to 20% discount. Full pricing
General notes
The questions production directors, welding engineers and class-compliance leads ask in the first meeting.
Does Hullira write to my welding robots, coating cells and MES?
Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified WPS, coating, dimensional and schedule constraints, and only at the autonomy level your yard has set. Design partners start in shadow mode, where Hullira writes nothing. Class-critical seam changes, lift plans and block release stay with named people.
What happens if the edge node or the network fails?
Control returns to the robot controller, PLC or planner's last known-good state. Hullira is a supervisory layer on top of the controllers and interlocks you already run, never a replacement for them, so an outage degrades the process to its current way of running, not to a stop.
How much data do you need before it is useful?
Advisory recommendations start from the physics-based twin, the WPS and the block drawings in the first weeks. Defect, distortion and coating prediction improve as block history and labelled NDT and surveyor outcomes accumulate. Onboarding is sized at 100 to 500 GPU-hours per yard and 50,000 to 250,000 synthetic variants per vessel class, both design targets.
Do our drawings, WPS and naval data leave the yard?
Only if you choose cloud training. Drawings, WPS and PQR, naval data, process models and quality records are isolated per tenant and never used to train another customer's models. A fully on-prem deployment at the yard edge is available for naval and regulated yards.
Who is accountable when an agent makes a bad move?
You are, the same as with any procedure change. That is why every write is policy-checked, bounded, logged and reversible, and anything above your risk threshold waits for a named approver. The audit log records the request, the evidence, the WPS or class citation applied and the human decision.
How long does a pilot take?
A paid pilot covers one process, with a success metric written into the order form: weld rework, fairing hours, coating non-conformance, dock days or class-approval cycle time. Shadow mode comes first and the baseline is measured from your own records. We do not publish a pilot length because we have not run one.
Start with one process and the number you already count.
A paid pilot on weld inspection, distortion control or coating assurance, measured against your own records, shows the result before you commit further.
Looking for 2 to 4 design-partner yards with
- Panel lines with robotic welding
- Block assembly halls
- Accuracy-control teams with laser scanning
- Ballast-tank blast and coat areas
- Dry docks with mega-block erection
- Repair and conversion yards